Our Research

RemodelingHowever run the plastic drain strains and vents earlier than starting any supply work. Drain any water in the supply strains, cut the cold and hot lines feeding the lavatory, and solder in two ball-valve water shutoffs. In case your bathroom is built on concrete with the principle stack directly behind the bathroom as ours was, stick with a traditional, floor-mounted toilet so you will not have to cut out the floor and rework the plumbing underneath the concrete.

Your lavatory may have galvanized, cast iron or plastic drain traces and vents. The wall-hung bathroom’s supply line must have a male adapter with a temporary galvanized cap. Then flip off the principle water provide line the place it comes into the home from exterior, reduce the pipes feeding the toilet and install the brand new shutoffs right away (see Photograph 7).

Substituting a shower for the bathtub, adding a large mirror, and using a wall-hung sink and toilet all contribute to the spacious feeling. Toenail 2×6 blocks in the center of the shower 36 in. above the ground for the bathe valve and 6 ft. 6 in. above the floor for the showerhead. Our toilet is 6 ft. broad, so we added a flooring-to-ceiling 2×6 wall on the showerhead end and a shorter 2×6 wall on the opposite finish.

Connect the sink to the trap and drain line, and the provision traces to the roughed-in copper lines with compression valve shutoffs. Changing current flooring house – Converting present flooring area into a household room costs about $7,500 to $25,000 or more, relying on options and supplies. Nonetheless, high demand and tight provide are pushing up housing costs and including to concerns about affordability.

Dry-fit the PVC piping meeting for the wall-hung bathroom, shower entice and sink. Additionally cut out and take away all the existing water lines and fittings within the bathroom. Flip off the main water supply to the house, and in a convenient location, lower the hot and cold water supply pipes for the toilet. Rerouting drain line plumbing is a big job on bathrooms which might be built on slabs.