404 Page

RemodelingYour toilet could have galvanized, cast iron or plastic drain lines and vents. The wall-hung bathroom’s provide line must have a male adapter with a brief galvanized cap. Then flip off the main water provide line where it comes into the home from outdoors, minimize the pipes feeding the lavatory and set up the new shutoffs straight away (see Photo 7).

It is much simpler to route water provide strains around drain strains than to route drains and vents around supply strains. Routing water supply lines is different in every toilet, so you’ll need to adapt runs to your state of affairs. Adding a second floor – A 1,500 square foot second ground can value between $225,000 and $450,000, depending on the floor plan, options, and other structural considerations.

However run the plastic drain traces and vents before starting any provide work. Drain any water within the supply traces, lower the hot and cold strains feeding the lavatory, and solder in two ball-valve water shutoffs. If your bathroom is constructed on concrete with the primary stack instantly behind the toilet as ours was, stick to a conventional, floor-mounted toilet so you will not have to chop out the floor and rework the plumbing under the concrete.

Lower the main stack and all the other waste traces feeding the bathroom about three ft. under the floor. We special-ordered this Swanstone base from a plumbing fixture provider together with the wall-hung bathroom and sink. Pros will tremendously pace up the challenge, which is particularly vital if the bathroom beneath development is the one one in the house.

Dry-match the PVC piping assembly for the wall-hung rest room, bathe lure and sink. Also reduce out and remove all the prevailing water traces and fittings within the rest room. Turn off the primary water provide to the house, and in a handy location, minimize the hot and cold water provide pipes for the toilet. Rerouting drain line plumbing is a huge job on bathrooms that are built on slabs.